HALO LIFTS PRO Truck Lift 4 Post Car Lift – 12,000 LBS Capacity
Model: HL PRO Truck
Key Specifications
12000 lbs
Capacity
Sec
Rise Time
Power
”
Max Rise
$7299.00
– Ships in 2-3 Business Days
Fitment Check
”
Narrow Bay Compatible
”
Standard Garage Depth
”
Depth @ 3000 PSI
”
For SUV parking below
Product Description:
The Lab Verdict
Executive Summary
80
/100
The Verdict:
The Halo PRO Truck Lift is a 12,000-lb four-post built for full-size trucks and SUVs — extra-long 231-inch runways, wide 23.6-inch platforms, and 86.6 inches of lift height in Halo’s heavy-duty PRO construction. It’s the four-post to buy when your vehicles are longer, taller, and heavier than a standard car lift handles. For a single-car PRO four-post, the HL9K-PRO.
- Full-size trucks, duallys, and large SUVs
- Storing or servicing long, heavy vehicles
- Buyers who want Halo’s heavy PRO build with high capacity
- Standard cars (a 9k four-post costs far less)
- Short garages — the 231″ runways need length
Engineering Analysis
The “Deep Dive”
Hydraulics & Rise Time
An electric-hydraulic power unit raises both long runways together on equalized cables.
Safety Lock System
The PRO build’s multiple mechanical lock positions hold the runways on steel stops at up to 86.6″ of lift.
Structural Integrity
Heavy-duty PRO four-post rated 12,000 lb: 231.7″ long runways, 23.6″ wide platforms, 86.6″ lift height, 131.5″ overall width. Built for trucks and SUVs.
Complete Technical Specifications
Specification | Value | Note |
|---|---|---|
Lifting Capacity | 12000 Ibs | Good for: Light Duty Trucks, SUVs, Sedans |
Overall Length | ” | Measure from garage door to back wall |
Overall Width | ” | Fits in standard single car bay |
Drive-Through Width | 115” | Restrictive – tight for wide vehicles |
Max Rise Height | ” | For car stacking calculations |
Motor | 220v motor standard” | Requires 30 Amp Breaker – NOT 110V compatible |
Rise Time | Sec | Slower than 2-post lifts (30-40 sec) |
Concrete Req. | ” Min Depth | Standard Residential Slab is usually 4″ |
Concrete PSI | PSI | Must be fully cured (28 days minimum) |
Customer Builds
Real installations from real garages

































